Deck frame was preassembled in the shop to speed up load in. (Drafting linked above)
After installing in space, decking was added. (Drafting linked above)
Deck ramp was built in space to accommodate the partial corner of the apron underneath.
The steel structure of the ceiling from 'Misery' was modified and covered with shingles to be reused for this production.
Coordinated with facilities to acquire real pine trees for set decoration.
Constructed frame and added base layer of foam for paints to build up and carve rock wall. (Drafting linked above)